国产成人精品在线-国产成人精品综合-国产成人精品综合久久久-国产成人精品综合在线-天天做日日爱夜夜爽-天天做日日干

Scan code consultation:
0755-2102 2109
Service
Current location: Home Service Ex Certificate
Implementation Rules for Testing Methods of Intrinsic Safety Electrical Equipment

SINO Testing Services

| 2020-06-22|Return

Range

1、 It specifies the inspection procedures, data review, prototype testing, and experiments for intrinsically safe electrical equipment used in explosive environments. This testing implementation rule is a supplement to the requirements of GB/T 3836.4, GB/T 3836.18-2024, and others.
2、 Applicable for the inspection of intrinsically safe electrical equipment used in explosive environments, products such as mining lamps can also be referred to.


Inspection basis

GB/T3836.1-2021 Explosive Atmosphere Equipment Part 1 General Requirements
GB/T3836.4-2021 Explosive Atmosphere Part 4 Equipment Protected by Intrinsic Safety Type "i"
GB/T 3836.18-2024 Explosive Atmosphere Part 18: Intrinsic Safety Systems
GB4208-2017 Degrees of Protection Provided by Enclosures (IP Code)

Inspection Procedure

1. The inspected unit shall prepare technical data related to the explosion-proof performance of the applied product in accordance with the requirements of GB/T 3836.1-2021 (the enterprise commission shall have a commission form signed by the enterprise legal representative, and the safety standard commission shall have a safety standard technical review task book); Registration in the Traffic Center Business Office;
2. The business room will submit the received technical data and receipt to the explosion-proof room, and issue a technical review task book at the same time;
3. After receiving the information, the explosion-proof room will be registered by a dedicated person and posted on the intranet. All authorized personnel can download it from the internet; After the chief examiner receives the task and fills in the relevant information, they return it to the data receiver for summarization. The technical data registration form should reflect all time nodes to facilitate task monitoring.
4. Task distribution: Routine tasks are registered and completed by the data receiver, and then handed over to the director of the technical review room for arrangement of the chief examiner. Import or other special tasks shall be arranged by the director or deputy director of the explosion-proof room. The time should not exceed 24 hours.
5. Review method: The review adopts a two person review method that combines primary review and secondary review.
6. The deadline for review is divided into three categories: simple, general, and complex drawings and materials. Simple information generally takes no more than 0.5 working days, general information review takes 1 working day, and complex information takes 2 to 3 working days. The specific time limit shall be proposed by the task distributor.
7. After receiving the technical materials, the chief examiner shall make a review plan according to the requirements of the review commissioning unit, and conduct the review based on standards such as GB/T 3836. The review content includes product standards, drawings, user manuals, detailed lists of controlled components, calculation sheets, and more
Technical materials related to explosion-proof review, such as material inspection reports, should be reviewed and recorded. After the initial review is completed, it shall be submitted for review and inspection. The verification personnel shall fill out the verification record form. After the review personnel have no doubts, the chief examiner shall promptly notify the inspected unit of the review opinions and record the contact information, contact person, and main matters in the memo card. Communication with clients should be prepared in advance, and all issues should be reported at once with written records.
8. After verifying the modified technical data, the reviewing personnel should promptly arrange for a re examination and keep records upon receiving the modified data from the inspected party. For issues that still do not meet the requirements after modification, timely feedback should be given to the inspected party and the processing time and nature of the problem should be recorded in the memo card, which belongs to those that have not been modified properly or those that have been modified. The modification process may be repeated multiple times, but the reviewer must clearly record the processing time nodes and main matters in the memo card; For materials that have been modified more than twice but still fail, they should be reported to the inspection room.
9. The paper materials are reviewed and approved, and after confirmation and signature by the reviewing personnel, the drawings are stamped. The stamping of the drawings is completed by the reviewing personnel, and only the materials involved in the review process are stamped. Unrelated drawings do not need to be stamped;
10. After the stamping is completed, one copy of the documents shall be handed over to the inspected unit, and the other copy shall be temporarily stored by the reviewing personnel. After the test is qualified and the certificate is issued, it shall be archived and kept together with the inspection report and explosion-proof certificate.

11. For the technical data review of products entrusted for sample submission for the first time, modifications can be proposed in conjunction with product inspection. However, all technical review work should be completed before issuing the report and certificate of conformity. The review records should be filled out completely, signed, and the drawings should be stamped and delivered to the inspected party.

12. Prototype testing and experimentation shall be carried out in accordance with the relevant regulations of the center


Technical review
Technical review includes standard review, drawing review, user manual review, and review of explosion-proof related materials provided by the enterprise. Devices that only use semiconductors and controllable semiconductors for current limiting protection cannot be classified as "ia" level.

Equipment Description
Technical review should specify the explosion-proof type and working principle of the equipment; Please describe the power supply method of the equipment, including wireless, infrared, laser, ultrasonic, etc; If it is a product change, list the changes and how the changes affect the explosion-proof performance.

Final assembly drawing
Complies with the provisions of GB4457-4460 "Mechanical Drawing". The overall plan should reflect the basic structural characteristics of the product, including a detailed list of parts, external dimensions, markings, and identification; The technical requirements should include the following: reference standards, requirements for shell protection level; Requirements for surface insulation resistance (if any); Working voltage, working current; The electrical clearance and creepage distance of intrinsic safety terminals, as well as the spacing between intrinsic safety terminals and non intrinsic safety terminals.
Special attention should be paid to:
a) The metal content of the metal shell and metal components of the shell shall meet the requirements of GB/T 3836-1-221 (with particular attention to the requirements for lightweight alloys; Class I portable instruments, lamps, and electric drills shall be made of lightweight alloys that meet the friction spark test method specified in GB/T13813-2008, and Class II EPL Ga and EPLGb requirements); Non metallic materials have a surface area size and surface insulation resistance of<1G Ω.
b) If it is a series of products, the differences between each model of product and their impact on explosion-proof performance should be explained in detail, and relevant drawings should be attached.
c) If other explosion-proof types are included in the composite product, corresponding drawings should be attached. If there are certified explosion-proof components in the system, the model name/explosion-proof mark and explosion-proof certificate number should be marked, and a copy of the explosion-proof certificate should be attached.

Mechanical structure diagram
The product should have shell drawings, sealing strip drawings, and wiring terminal diagrams;


POS machine gas and dust detector explosion-proof mobile phone

Electrical schematic diagram
Review the components or circuits in the electrical schematic that affect the intrinsic safety performance, and provide specific descriptions according to the provisions of GB/T 3836.4. Confirm the intrinsic safety parameters (voltage, current, inductance, and capacitance), record and analyze them, and evaluate them.
If there are both intrinsic safety circuits and non intrinsic safety circuits in the circuit, intrinsic safety circuits need to be marked with dashed boxes.
If the circuit or device is sealed to meet the requirements, the sealed part should be marked with a dashed box and a sealing process document should be provided.
a) Reliable components:
Transformer, current limiting resistor;
——The structure of the transformer shall comply with the requirements of GB/T 3836.4-2021; If it is a power transformer, its primary should have fuse protection; The transformer should provide a structural diagram of the transformer (special attention should be paid to marking the thickness of the shielding layer, winding spacing, thickness of the solid insulation layer, and the withstand voltage requirements between each winding, etc.)
——Current limiting resistors can only be thin film, wound, or printed resistors;
b) The rated values of components related to intrinsic safety shall meet the requirements of GB/T 3836.4;
——Current limiting resistor;
——DC/DC power chip;
——Sampling comparison circuit in semiconductor current limiting circuit, MOS transistor, transistor;
——Zener diodes and thyristors in semiconductor voltage limiting circuits;
——The switch chip in the switch power supply circuit.
c) Evaluation of pure resistance circuit: Calculate whether the current under the corresponding voltage in the circuit meets the requirements of GB/T 3836.4.
d) Evaluation of capacitance: Calculate the maximum capacitance of each voltage level under technical and non-technical fault conditions of ia and ib, and evaluate it according to the curve or table in the appendix of GB3836.4, with a safety factor of 1.5 applied during evaluation. When capacitors are used according toGB/TWhen the safety factor is improved by series resistance in Appendix F of 3836.4, the resistor and capacitor should be encapsulated as a whole;
e) Evaluation of inductance: The maximum (equivalent) inductance value of the induction is calculated based on the corresponding explosion-proof level (ia, ib) for technical and non-technical faults, and the current on the inductance is calculated
Formula for calculating energy, usingGB/TEvaluate the energy given on the curve in Appendix 3836.4; When evaluating, apply a safety factor of 1.5. When the inductor is connected in parallel with the diode, the inductor must be encapsulated as a whole with the diode; Special attention should be paid to the applicability of sealing for rotating motors to prevent ignition of shaft end clearances.
f) Isolation device:
——Transformer;
——Optocoupler;
——Relay;
——Capacitors (IA protection level requires 3 capacitors to be connected in series, IB protection level requires 2 capacitors to be connected in series);
Note: In addition to meeting the requirements for voltage resistance, the spacing between optocouplers, relays, and capacitors must also meet the requirements of Table 5 of GB3836.4.

Printed board diagram
Confirm the voltage, current, inductance, and capacitance involved separately for the printed circuit board and component installation diagram combined with the component list.
The printed layout should record the following information
——The printed board diagram should be consistent with the actual product.
——Technical requirements should include dimensions such as printed board thickness, conductive film thickness, printed line width, and board line spacing;

Battery
The review of batteries and battery packs should record the following information:
a) Battery and battery pack structure type: sealed or shell sealed;
b) Maximum open circuit voltage of the battery: compliantGB/T3836.1 When specified in Tables 10 and 11, take the voltage from the tables. Batteries not listed in Tables 10 and 11 shall be treated as loose components, and the maximum open circuit voltage shall be determined by testing at 10.5. The nominal voltage shall be taken from the specified value of the battery manufacturer.
c) Internal resistance of batteries and battery packs: The internal resistance of batteries and battery packs should be determined according to 10.5.3. If a current limiting resistor is used to limit the current that the battery pack may generate, its rated value should meet the requirements of 7.1.
Note 2: When it is necessary to use a current limiting device to protect the output safety of the battery pack, it is not required to use the current limiting device as an integral component of the battery pack.
d) Current limiting device:
——When the battery pack is intended for use and replacement in explosive environments: the battery pack should form a replaceable component with the current limiting device. The unit components should be encapsulated or sealed, and only the intrinsic safety output terminals and appropriately protected charging intrinsic safety terminals (if provided) can be exposed.
——The battery pack should not be replaced in explosive environments: The battery or battery pack can be installed according to the requirements for the intended use and replacement of the battery pack in explosive environments, or it can be installed in a device withGB/TInside the cavity of special fasteners specified in 3836.1.
e) Connection method: The layout of the battery, battery pack bracket, or device connection method should ensure that the intrinsic safety performance of the device is not compromised during installation and replacement of the battery or battery pack.
f) Handheld or portable electrical equipment: For complete handheld or portable electrical equipment, it should undergo the drop test specified in Article 26.4.3 of GB3836.1. If there is no detachment or separation of the battery pack that causes the intrinsic safety performance of the equipment or battery to fail, the equipment structure is considered qualified.
g) Warning signs: The equipment should have warning signs as specified in GB3836.1, Article 29.11.
h) With external charging contacts: For batteries or battery pack components with external charging contacts, measures should be taken to prevent short circuits or to prevent single cells and battery packs from releasing enough energy to ignite when any pair of contacts may accidentally short circuit. Blocking diodes or series reliable resistors should be used.
Note: The highest voltage Um that may be applied to these charging contact connections should be marked on the equipment and can be controlled
As shown in the diagram.
i) Battery structure
The spark ignition ability and surface temperature of batteries and battery packs should be tested and evaluated according to the provisions of 10.4.3.
The structure of batteries and battery packs should be sealed (airtight) batteries and battery packs, valve controlled sealed batteries or battery packs, batteries and battery packs with pressure release devices, and sealed in the same way as the previous item.
These batteries or battery packs should not require electrolyte replenishment throughout their entire lifespan and should have metal or plastic sealed casings that meet the following requirements:; No need to verify that the battery or battery pack meets the manufacturer's technical requirements.

Components with loose regulations
For components with loose regulations, ten unused component samples should be taken from any source or several sources to measure their relevant parameters. Usually, the test should be conducted at the specified maximum ambient temperature (e.g. 40 ℃), or based on the maximum ambient temperature. But when necessary, temperature sensitive components (such as nickel cadmium batteries/battery packs) should be tested under low temperature conditions to obtain their most unfavorable conditions.
Different parameters can be taken from different samples, and the representative parameters of the component should be the most unfavorable values obtained from testing 10 samples.
Unrestricted components refer to components without standards or with incomplete parameters despite having their own standards; These parameters are essential for evaluating the intrinsic safety performance of the device.

Component List
The component list should be verified to be consistent with the electrical schematic, and the part numbers, drawing numbers, rated values, production units, etc. of the components should be clearly defined.

Nameplate
The drawing should specify the material of the nameplate and the method of pasting; The nameplate content should include: explosion-proof mark, working voltage, working current, intrinsic safety parameters, safety label number, explosion-proof certificate number, and production date.

Enterprise standards
The review of enterprise standards should pay attention to the following points
——Reference standards: GB3836, GB4208-2008, etc
——Explosion proof type and explosion-proof mark of the product
——Product usage environment
——Product testing requirements and testing methods
a) Intrinsic safety parameter testing:
b) Shell protection level test
c) Measurement of electrical clearance and creepage distance
d) Spark ignition test
e) Dielectric strength test
f) Maximum surface temperature test
g) Insulation resistance test on the surface of the shell
h) Battery leakage test
i) Explosion proof drop test
j) Isolation device withstand voltage test
k) Routine and type tests of transformers;

an instruction manual
The review of the user manual should pay attention to the following points
——The cover should have a reference standard GB 3836
——Explosion proof type and explosion-proof mark of the product
——Product usage environment
——Product intrinsic safety parameters
——Safety warning language, warning language





Service Hotline: 18924609560 (same WeChat account)

Related Recommendations
Contact us
0755-2102 2109
Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
Follow us
Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粵ICP備18004888號
Service Hotline
18924609560
點擊這里給我發消息 1354407946
點擊這里給我發消息 1354407946
亚洲中字幕日产2021草莓 | 无码人妻一区二区免费AV| 亚洲久悠悠色悠在线播放| 按摩男让我高潮做了3次正常吗| 国产乱人伦精品一区二区| 农村风流大炕作爱| 永久免费AⅤ无码网站在线观看| 公交车舒婷1一20全文| 日本爆乳丰满熟妇XXXX| 宝宝腿趴开一点就不会疼的原因| 欧美性狂猛AAAAAA| JZJZJZJZ日本L免费观看| 欧美精品一区二区三区在线| ASIANMATURE老熟妇女| 欧美群交在线播放1| JAPANESE中国丰满少妇| 秋霞在线观看视频| 播放少妇的奶头出奶水的毛片| 人妻AⅤ中文字幕| 不卡高清AV手机在线观看| 日产精品码2码三码四码区| 大陆极品少妇内射AAAAA| 色综合久久成人综合网五月| 国产99视频精品免视看7| 天堂在\/线中文在线8| 国产精品污WWW一区二区三区| 西方38大但人文艺术| 韩国电影办公室6免费完整版 | 亚洲国产精品无码久久久蜜芽| 精品欧洲AV无码一区二区男男| 亚洲熟妇中文字幕日产无码| 浪货趴办公桌~H揉秘书| 18禁高潮出水呻吟娇喘蜜芽| 欧美极品少妇XXXXⅩ猛交| А天堂最新版中文网| 色婷婷精品久久二区二区蜜臀av| 国产AV大陆精品一区二区三区| 无码中文亚洲AV影音先锋无码| 国产综合久久久久久鬼色| 亚洲欧美成人AⅤ在线专区| 久久久久无码精品国产AV蜜桃| 中文字幕人妻丝袜成熟乱| 欧洲熟妇色XXXXX视频| 大陆国语对白国产AV片| 特级毛片A级毛片在线播放WWW| 国产天堂亚洲国产碰碰| 亚洲人成无码WWW久久久| 两毫米的小洞你却稳稳命中| CHINA丰满人妻VIDEOS| 色综合久久综合欧美综合网| 国产女人高潮抽搐喷水嗷嗷叫 | 欧美猛少妇色XXXX久久久久| 成人性欧美丨区二区三区| 无码成人一区二区三区| 精品国产第一福利网站| 中文字幕人妻高清乱码| 人妻无码中文字幕永久有效视频| 公交车上掀开麻麻超短裙| 亚洲AV无码专区亚洲AV紧身裤| 久久久久亚洲精品无码网址| BGMBGMBGM毛多多视频1| 天堂AV亚洲ITV在线AⅤ| 狠狠色丁香久久婷婷综合_中| 一本大道一卡2卡三卡4卡国产| 欧美巨大乳BBWVIDEOS| 国产AⅤ无码专区亚洲AV| 亚洲AV优女天堂熟女| 毛片亚洲AV无码精品国产午夜| 被群CAO的合不拢腿H纯肉视频| 乌鸦传媒一二三区| 久久久久久精品免费免费直播 | 无码无套少妇毛多18PXXXX| 精品久久久久久天美传媒| 51CG9热心的朝阳群众| 丝袜护士无码视频一区二区三区| 皇帝在御花园进入贵妃的小说 | 无人高清视频免费观看在线| 精品无码国产污污污免费网站国产| 2019日韩中文字幕MV| 熟妇人交VIDEOS复古 | 大鷄巴久久久久久久久久| 亚洲AV无码一级毛片少妇| 免费A级毛片在线播放不收费| 低调看JRS直播| 亚洲精品无码鲁网中文电影| 欧美交换配乱吟粗大和黄| 国产成人一区二区三区免费视频| 亚洲色大成网站WWW久久| 去部队探亲晚上叫太大声| 国产午夜福利100集发布| 中文字幕AV日韩精品一区二区| 色综合久久一区二区三区| 久久精品岛国AV一区二区无码| WBBBB搡BBBB搡BBBB| 亚洲 欧洲 日产 经典| 男人J桶进女人J无遮挡| 国产精品国产自线拍免费| 影音先锋亚洲AV少妇熟女| 色综合色天天久久婷婷基地| 久久不见久久见免费视频3| 被强迫各种姿势侵犯N白月视频| 亚洲AV永久无码精品另类稀缺| 欧美级韩国三级日本三级| 国产亚洲VA综合人人澡精品 | 国产精品无码久久AV不卡| 中国老太太BBVBBⅤ| 未满十八岁可以去日本留学吗| 鲁鲁鲁爽爽爽在线视频观看| 国产精华精华液一二三区别| 中国熟妇人妻XXXXX中文| 无码精品人妻一区二区三区蜜桃| 蜜桃AV人片在线观看| 国产精品主播一区二区三区| 最新亚洲春色AV无码专区 | 欧美极品少妇XXXXⅩO69| 国产又粗又猛又黄又爽无遮挡| 99久久精品免费观看国产| 亚洲AV无码一区东京热久久| 人妻无码第一区二区三区| 精品国产AⅤ一区二区三区V视界 | 亚洲AV综合AV一区二区综合| 人妻色欲AV无码专区精油按摩| 精品无人区麻豆乱码无限制| 粗长巨龙挤进新婚少妇| 一区二区三区精品偷拍| 未成满18禁止免费无码网站| 欧美成人WWW免费全部网站| 国产在线观看无遮挡无码AⅤ多人 国产在线观看无码免费视频 | 国产午夜福利亚洲第一| JAPAN丰满人妻HDXXXX| 亚洲乱亚洲乱少妇无码99P| 少妇粉嫩小泬喷水视频WWW| 麻豆AV天堂一区二区香蕉| 国产无遮挡又黄又爽又色| 成年女人粗暴毛片免费观看| 伊人久久亚洲综合| 校花下乡被灌满受孕| 人人爽人人爽人人爽人人片AV| 久久久久久亚洲综合影院| 国产精品亚洲污污网站入口 | 波多野结衣一二三区AV高清| 一本到高清视频在线观看丶 | 欧美国产成人精品一区二区三区| 精品国产乱码一区二区三区| 高清欧美性猛交XXXX黑人猛交| 9420高清完整版在线观看| 亚洲欧美日韩综合久久久久| 我和岳乱妇三级高清电影| 人妻Av一区二区三区| 炕上光着腚压在女人身上| 国产又爽又黄又爽又刺激| 道德沦丧一家3口小说| 99久久久国产精品消防器材| 亚洲一区二区三区成人网站| 午夜精品久久久久久不卡| 日韩精品无码免费一区二区三区| 男女24式动态图| 久久精品国产99久久久香蕉| 国产特级毛片AAAAAAA高清| 丁香婷婷激情综合俺也去| 99无人区码一码二码三码四码| 亚洲中文字幕无码爆乳AV| 亚洲AV日韩AV永久无码水密桃 | 亚洲人成网线在线播放| 性夜影院爽黄A爽免费动漫| 色爱无码AⅤ综合区| 欧美日韩在大午夜爽爽影院| 久久夜色精品国产网站| 果冻传媒一区二区天美传媒| 国产精品久久久久久精品电影| 成在线人AV免费无码高潮喷水| 9精产国品一二三产区| 在教室伦流澡到高潮HGL动漫 | 人妻 清高 无码 中文字幕| 老汉粗大不带套怀孕| 久久99精品久久久久久清纯| 黑人粗大猛烈XXⅩXXBB| 国产老熟女精品一区熟女AV| 国产95在线 | 免费| 成人国产精品秘片多多| JULIA无码人妻中文字幕在线| 2022久久国产精品免费热麻豆| 伊人色综合久久天天小片| 亚洲一卡一卡二新区无人区| 亚洲爆乳无码专区| 亚洲AV日韩AV永久无码绿巨人| 无码色偷偷亚洲国内自拍| 天天摸夜夜摸夜夜狠狠摸| 少妇内射高潮福利炮| 日产无码精品一区二区三区| 人妻丰满AV无码久久不卡| 欧美高清视频手机在在线| 男人扒开女人内裤强吻桶进去| 里番本子库绅士ACG全彩无码| 久久精品国产精品亚洲色婷婷| 精东传媒剧国产MV的特点| 狠狠色噜噜狠狠狠狠7777| 韩日综合成人中文字幕| 黑人干人三区亚洲| 皇帝在御花园进入贵妃的小说|